PROJECT 1

To design, manufacture and build a facility for cylinder heads to be sequenced and synchronised to a main engine assembly line

The key factors of this project was the complexity of the different engine variants to be used, cycle time, error proofing and operator ergonomics.

‚Äč

Additional design considerations were required within the electrical and software aspects of the project. The electrical system had to be designed to be completely compatible with current control systems within the existing customer assembly facility. Safety systems were designed to give complete operator control at all times.